It's the day before the first day of school, so it's a good thing I closed on the property yesterday. I walked out this morning at 5:30 and started building it. Digging the foundation took until 9:00. I poured concrete and framed the first floor by 10:00. Next I set the central rafter and roughed out the roof. I took a half-hour break at noon for lunch. Then, feeling rain in the air, I finished up the roof. Back on the ground at 2:30, I wrapped the sides and brought in the window casements. With a little bit of protection, I went in and installed the plumbing and electrical wiring. By 4:00, I was done with the doors and and had almost finished the shingle siding. At 5:00, I started paving the driveway so the truck with the desks and books could get in at 5:15. I power washed the whole place and was done at 6:30. Students and teachers should start coming tomorrow at 8:30.
Tuesday, December 03, 2019
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment